Hollowfield Architects

Practice

Five people, one floor of a former glove factory.

Hollowfield was founded in Frome in 2013. We have stayed deliberately small: five of us, four or five live projects at a time, and one architect who carries each of them the whole way through.

The studio: a long shared oak desk under tall industrial windows in a brick-walled former factory, with card models along the desk and drawings pinned to the wall between the windows.

How we work

Most practices our size grow by taking more work and handing it down. We have chosen not to, because the thing clients actually value, and the thing we are actually good at, is that the person who drew the detail is the person standing under it on site.

It has consequences. We turn work down, sometimes work we would like. We are usually booked six to nine months ahead. And we are more expensive per square metre at the front end than a practice that puts a Part I on your survey. What you get for that is a scheme that has already survived the arguments before it reaches the planning portal.

One project, one architect

A director or the associate leads every job personally, from the first measured survey to the last defect. There is no delivery team to be handed over to, because there is no delivery team.

Existing buildings first

Roughly four fifths of our work involves something already standing, or a site where something already standing sets the terms. We do the survey, the fabric investigation and the heritage argument ourselves rather than buying them in.

Fabric before machinery

We would rather spend the budget on insulation, airtightness and orientation than on plant that has to be replaced in fifteen years. Tom is a certified Passivhaus designer and every scheme is modelled, whether or not it is going for certification.

People

Practicalities

We are ARB registered and RIBA chartered, with professional indemnity cover appropriate to the value of the work. We work to the RIBA Plan of Work and are happy to be appointed for the early stages only, if what you need is to find out whether a site will take what you want to put on it.

Our fees are a percentage of construction cost on larger projects and a fixed sum by stage on smaller ones. We will tell you which we think is fairer for your job, and we will put the number in writing before you commit to anything.

Get in touch